Science stories from Africa Now showing
CompletedDraft · awaiting verification

New Suez Canal

A $8.2 billion expansion doubling the capacity of one of the world's most critical waterways.

Explainer film in production
§ 01About the project

The New Suez Canal project involved the construction of a 35 km new parallel channel alongside the existing Suez Canal and the widening and deepening of another 37 km of the existing waterway. Completed in just one year at a cost of $8.2 billion, entirely funded by Egyptian investment certificates, the project was inaugurated in August 2015. It enables two-way traffic through much of the canal, reducing transit waiting times from an average of 18 hours to 11 hours and increasing the canal's daily ship capacity from 49 to 97 vessels.

§ 02What it aims to do
  1. 01Enable two-way traffic through the Suez Canal to reduce transit times
  2. 02Increase daily vessel capacity from 49 to 97 ships
  3. 03Reduce average waiting time for ships from 18 hours to 11 hours
  4. 04Increase canal revenue by accommodating more and larger vessels
  5. 05Stimulate economic development in the Suez Canal Economic Zone
  6. 06Reinforce Egypt's strategic role in global maritime trade
§ 03Milestones
  1. 2014-08 · completed

    Project Announced

    President Abdel Fattah el-Sisi announced the New Suez Canal project, with a target completion of one year.

  2. 2014-09 · completed

    Investment Certificates Sold

    Egypt raised $8.2 billion in just 8 days by selling investment certificates to Egyptian citizens.

  3. 2015-01 · completed

    Dredging Complete

    Major dredging and excavation works on the 35 km new channel were substantially completed.

  4. 2015-08 · completed

    Grand Inauguration

    The New Suez Canal was inaugurated on 6 August 2015 in a major ceremony with international leaders in attendance.

  5. 2023 · completed

    Revenue Records

    The Suez Canal Authority reported record annual revenue of $9.4 billion for the fiscal year 2022-2023.

  6. 2024 · completed

    Red Sea Disruption Impact

    Houthi attacks in the Red Sea caused significant drops in canal traffic, highlighting the waterway's global importance.

§ 04Engineering & resources

Owner/Operator

Suez Canal Authority (SCA)

The Egyptian state authority that owns, operates, and maintains the entire Suez Canal waterway.

Construction Lead

Egyptian Armed Forces Engineering Corps

The military's engineering corps played a central role in managing and executing the excavation and construction.

Financing

National Investment Certificates

The project was entirely funded by Egyptian investment certificates sold to citizens, avoiding foreign debt.

Dredging Contractors

International Dredging Consortium

A consortium including Boskalis, Van Oord, Jan De Nul, and DEME handled the marine dredging operations.

  • Large-scale dredging with cutter suction dredgers
  • Dry excavation of desert terrain for the parallel channel
  • Deep-water channel engineering (24 m depth)
  • Advanced vessel traffic management systems
  • Real-time canal monitoring and navigation aids
  • Environmental impact mitigation for the Bitter Lakes ecosystem

What it means for the community

The expanded canal handles approximately 12-15% of global trade by volume. Annual revenue reached a record $9.4 billion in 2022-2023 before Red Sea disruptions. The project created an estimated 1 million direct and indirect jobs during construction and has been a catalyst for the Suez Canal Economic Zone, attracting billions in industrial investment. The canal remains Egypt's most important source of hard currency.

§ 05Articles

No articles on this project yet. Subscribe to the newsletter to hear when one is published.

§ 06Partners & owners
  • Suez Canal Authority (Government of Egypt)