Kibali Gold Mine

Africa's largest gold mine, producing over 700,000 ounces annually from the heart of the DRC.

Explainer film in production
§ 01About the project

Kibali is one of the world's largest gold mines, situated in the remote northeast of the DRC. It is operated by Barrick Gold (45%) in a joint venture with AngloGold Ashanti (45%) and the DRC state mining company SOKIMO (10%). The mine poured its first gold in September 2013 and produced approximately 750,000 ounces in 2023. Kibali combines open-pit and underground operations with a state-of-the-art metallurgical complex.

§ 02What it aims to do
  1. 01Sustain gold production above 700,000 ounces per year through underground expansion
  2. 02Extend mine life through continued exploration and resource conversion
  3. 03Operate three hydroelectric power stations to minimize carbon footprint
  4. 04Deliver economic development to one of the DRC's most remote regions
  5. 05Maintain industry-leading safety and environmental management standards
  6. 06Transition progressively from open-pit to underground mining
§ 03Milestones
  1. 2009 · completed

    Joint Venture Formed

    Barrick Gold and AngloGold Ashanti formed a joint venture to develop the Kibali gold deposit.

  2. 2013 · completed

    First Gold Pour

    Kibali poured its first gold bar in September 2013, marking the start of commercial production.

  3. 2017 · completed

    Underground Production Begins

    Underground mining commenced, adding higher-grade ore to supplement the open pit.

  4. 2019 · completed

    Record Production

    The mine achieved record annual gold production of over 814,000 ounces.

  5. 2022 · completed

    Autonomous Haulage

    Kibali deployed automated underground haulage trucks, becoming one of the first in Africa to do so.

  6. 2025 · in progress

    Continued Underground Expansion

    Ongoing development of deeper underground levels to sustain production through the 2030s.

§ 04Engineering & resources

Mineral Resource

Gold Mineral Reserve

Proven and probable reserves of approximately 11.3 million ounces of gold as of year-end 2023.

Processing Plant

Metallurgical Complex

A 7.2 Mtpa processing plant with gravity separation, flotation, CIL, and ultra-fine grind circuits.

Energy Infrastructure

Hydroelectric Power

Three run-of-river hydroelectric stations on the Kibali River providing approximately 44 MW of clean power.

Mining Infrastructure

Underground Mine

Sublevel caving operation accessed via twin declines, producing the majority of ore feed.

Exploration Asset

Exploration Tenements

Extensive exploration permits covering over 3,000 square kilometres surrounding the mine.

  • Sublevel caving underground mining method
  • Automated underground haulage with autonomous trucks
  • Carbon-in-leach (CIL) gold processing circuit
  • Gravity separation gold recovery
  • Three on-site hydroelectric power stations (Nzoro, Ambarau, Azambi)
  • Paste backfill plant for underground void management

What it means for the community

Kibali employs over 5,500 people directly and supports approximately 11,000 indirect jobs, with over 95% of the workforce being Congolese nationals. The mine has invested more than $250 million in community development since inception, including schools, health clinics, roads, and agricultural programs. It generates substantial tax revenues and royalties for both the national and provincial governments.

§ 05Articles

No articles on this project yet. Subscribe to the newsletter to hear when one is published.

§ 06Partners & owners
  • Barrick Gold (45%)
  • AngloGold Ashanti (45%)
  • SOKIMO (10%)