Kribi Deep Sea Port

Cameroon's first deep-water port, a $1.3 billion gateway to Central Africa's resource-rich hinterland.

Explainer film in production
§ 01About the project

The Kribi Deep Sea Port is Cameroon's first deep-water port, located approximately 150 km south of Douala. Phase 1, completed in 2018 at a cost of $567 million, includes a multipurpose terminal and a container terminal with a 16-metre draught. Phase 2, estimated at over $700 million, will add additional container and hydrocarbon berths. The port serves as an export terminal for iron ore from the Mbalam-Nabeba project and handles general cargo for landlocked Central African countries including Chad and the Central African Republic. It is operated by Kribi Conteneurs Terminal (KCT), a Bolloré subsidiary.

§ 02What it aims to do
  1. 01Provide Cameroon with a modern deep-water port to complement the congested Douala port
  2. 02Handle mineral exports from Cameroon's mining sector, particularly iron ore
  3. 03Serve as a gateway for landlocked Central African Republic and Chad
  4. 04Accommodate larger vessels that cannot access the shallow Douala port
  5. 05Develop a port-centric industrial zone to attract manufacturing investment
  6. 06Increase Cameroon's port competitiveness in the Gulf of Guinea
§ 03Milestones
  1. 2011 · completed

    Construction Begins

    Phase 1 construction commenced with China Harbour Engineering Company (CHEC) as the main contractor.

  2. 2014 · completed

    Port Infrastructure Complete

    Major marine infrastructure including the breakwater, berths, and approach channel were completed.

  3. 2018 · completed

    Phase 1 Inaugurated

    President Paul Biya inaugurated Phase 1, and the port received its first commercial vessels.

  4. 2021 · completed

    Container Operations Ramp Up

    Container throughput increased as the terminal operated by Bolloré's KCT attracted more shipping lines.

  5. 2023 · in progress

    Phase 2 Planning Advanced

    Detailed engineering and financing for Phase 2 expansion progressed with additional berths planned.

  6. 2025 · in progress

    Phase 2 Construction

    Phase 2 construction activities commenced for additional terminal capacity.

§ 04Engineering & resources

Construction Contractor

China Harbour Engineering Company (CHEC)

Built Phase 1 infrastructure including berths, breakwater, and terminal facilities.

Terminal Operator

Kribi Conteneurs Terminal (KCT/Bolloré)

Bolloré subsidiary operating the container terminal under a 25-year concession.

Lead Financier

China Exim Bank

Provided concessional loans for the majority of Phase 1 construction costs.

Port Authority

Kribi Port Authority

The national authority managing the overall port complex and regulatory oversight.

  • 16 m deep-water berths for Capesize and Post-Panamax vessels
  • Ship-to-shore gantry cranes
  • Multipurpose and container terminal equipment
  • 1,355 m main breakwater for wave protection
  • Connected highway to Douala-Kribi corridor
  • Oil and gas pipeline terminal connection (planned)

What it means for the community

The port has diversified Cameroon's port infrastructure beyond the congested Douala port and attracted new shipping services. It handles growing volumes of containers and bulk cargo, serving landlocked neighbours. Phase 1 created approximately 5,000 construction jobs, and the port directly employs over 500 workers. When the mining corridor is fully operational, Kribi will export millions of tonnes of iron ore annually, potentially transforming Cameroon's export profile.